|
|
|
BTI provided four spans 66' long for the phase two bridge and supplied four spans 66' long for the phase three bridge over the Des Plaines River in Riverside, Illinois. This project was the first to utilize post-tensioned concrete BTI BRIDGE GIRDERS.
|
|
|